Supply, installation, testing and commissioning of Power substations along with associated switchgear such as VCB, control & relay panel, structural bays, double circuit 33/11KV overhead lines, underground cabling work and reconductoring of 110KV lines.
- 110KV line reconductoring work using HTLS conductors at Ponda – Verna, Verna – Xeldem
- 6.3 MVA Power substation for Shiroda
- 10 MVA power substation for Sanquelim, Majorda, Fatorda, Nuvem, Monte Hill, Cuncolim, Porvorim, Nagoa
- 33KV Underground cabling:
- Virdi to Sanquelim – 7 kms
- Bhuipal to Valpoi – 9 kms
- Underground cabling Rivem
- Thane to Surla – 14 kms
- Double circuit overhead lines from Bondbagh to Shiroda – 10 kms